Guello Construction
Remodeled primary bathroom with a freestanding tub under a steel window, a floating white oak vanity, and a zellige tile shower in morning light
BeforeAfter

Bathrooms

Bathroom Remodeling in Austin, TX

Your day starts and ends in this room. Right now that might mean a cramped tub nobody uses, a vanity two people cannot share, tile you scrub and still hate. It should be the best ten minutes of your morning: a shower you linger in, stone warm underfoot, light you actually look good in, a door you close and exhale behind. We build that room. And because water punishes every shortcut, we build it to stay beautiful for decades, not just for the photo shoot.

01The Scope

What a bathroom remodel with us includes

Full scope, one contract: demolition, plumbing rough-in and relocation, electrical with dedicated circuits for heated floors and vanity lighting, framing for curbless showers and niches, full waterproofing systems behind every wet wall, tile setting, stone or quartz counters, custom vanities, glass enclosures, fixtures, and paint. If we open a wall and find the last guy's mistakes, you get photos and a straight answer, not a mystery charge.

Primary baths are where most of our Austin clients start. Walk-in showers where a tub used to crowd the room, freestanding tubs where there is space to justify one, double vanities with real storage, and lighting you can actually get ready by. Hall baths and guest baths get the same waterproofing and the same tile standards, scaled to a tighter budget.

Tile is the soul of the room and we treat it that way. Layout is drawn before a single piece is cut, cuts land where the eye does not go, and we never rush a setter. It is the one trade where a saved day shows forever.

Wet room with a freestanding tub inside frameless glass and book-matched marble slab walls

02Recent Bathrooms

Different houses, same standard.

Moody powder bath with dark plaster walls, a carved travertine vessel sink, and a brass sconce
Bright primary bath with a white oak double vanity, arched brass mirrors, and herringbone marble floor
Curbless walk-in shower in sage-green mosaic tile with a linear drain and recessed niche
Stone tub beneath a skylight with tumbled limestone walls and a sunbeam across the room
Classic hall bath with white hex mosaic floor, green wainscot, and a marble-topped shaker vanity
Warm minimalist bath in travertine with a floating double vanity and backlit mirror
Steam shower with a built-in stone bench, black-framed glass, and a teak stool with towels

03Timeline

A full primary bath remodel typically runs 4 to 6 weeks. Hall baths often finish in 3 to 4. Glass enclosures are measured after tile and add about two weeks at the end, which we build into the schedule from day one.

04Typical Investment

Tile scope, fixtures, and plumbing changes set a bathroom budget. The price is fixed in writing before demo, and we will tell you plainly which upgrades show and which just cost.

Every estimate is written for your exact house and scope, free, after a walkthrough. No pricing games.

05Free Estimate

Start with a walkthrough.

Tell us about the project and we will call within one business day. Or skip the form: (630) 827-2735

Free, no obligation. We reply within one business day.

Call or TextFree Estimate