Guello Construction
Remodeled primary bathroom with a freestanding tub under a steel window, a floating white oak vanity, and a zellige tile shower in morning light

Bathroom Remodeling in Bee Cave, TX

The 2000s Bee Cave primary bath is a big room doing very little. An oval drop-in tub centered under a window with columns on either side. Travertine on every surface. A shower large enough for two with a curb, a seat, and body sprays nobody turns on. Bronze fixtures that have gone dull. Spanish Oaks, Falconhead, and Lake Pointe are full of them. We rebuild that square footage into a wet room with the light and the stone the house deserves. Bathroom remodeling in Bee Cave, owner-led, fixed price before demo.

Free written estimates in Bee Cave. Call or text the owner: (630) 827-2735

01Bee Cave

The bathrooms Bee Cave was built with

Spanish Oaks and Falconhead primaries from the 2000s have room, plumbing in good shape, and panels with capacity. What they do not have is a plan that uses the space. The tub platform is a stage. The shower is tiled in 12-inch travertine with a curb and a mud-set pan over a liner that is now twenty years old. Vanities are long with doors, framed mirrors, and a bronze light bar. Floors are travertine that has etched and pitted around the toilet and the tub.

Lake Pointe's 1990s baths run smaller and more conventional: tiled garden tub in the corner, a 36-inch shower, cultured marble or tile counters. Bee Cave sits on limestone, so slabs are flat and sound. Recessing a curbless shower is easy. Moving a drain across the room means cutting rock, so we design around the existing drain lines when we can and price the cut up front when we cannot.

Outdoor living space with cedar ceiling and stone fireplace at a Bee Cave, Texas home

02Bee Cave

What we usually build in Bee Cave

The columns and the platform go. In their place: a wet room behind one line of glass, with a freestanding tub under the window and a shower beside it sized for the people who live there. The old liner pan comes out and a full waterproofing system goes in, curbless, with a linear drain. Travertine comes off the walls and the floor, and lighter stone or large-format porcelain goes back with the layout drawn before the first cut. Heated floors and a steam unit are common requests here.

Vanities get rebuilt with drawers, taller mirrors, and sconces at face height instead of a bar overhead. The water closet gets a real door and its own fan. In Lake Pointe the garden tub becomes a larger shower and the room gets the same tile standard at a tighter budget. Powder baths in Bee Cave houses are often small and dark, and we treat them as the one room a guest will remember.

03Bee Cave

Permits, HOAs, and logistics in Bee Cave

Bathroom remodels that move plumbing or add circuits are permitted through the City of Bee Cave. We file and meet the inspectors. Some addresses in the area are in unincorporated Travis County or the city's extraterritorial jurisdiction rather than the city itself, so we confirm the authority before filing. Spanish Oaks requires contractor registration at the gate and reviews exterior changes, and the Falconhead and Lake Pointe HOAs set work hours. A new or larger window over a tub is an exterior change.

Heavy stone slabs and large-format tile travel out Highway 71 from Austin, and gated streets mean deliveries need to be timed, so we stage materials and schedule the glass measurement the day tile is finished. A primary bath runs 4 to 6 weeks, a hall bath 3 to 4, and glass adds about two weeks at the end. Travertine removal is in the schedule. Price is fixed in writing before demo, and the owner is on your site.

04Timeline

A full primary bath remodel typically runs 4 to 6 weeks. Hall baths often finish in 3 to 4. Glass enclosures are measured after tile and add about two weeks at the end, which we build into the schedule from day one.

05Typical Investment

Tile scope, fixtures, and plumbing changes set a bathroom budget. The price is fixed in writing before demo, and we will tell you plainly which upgrades show and which just cost.

06Questions

Bathrooms in Bee Cave, answered.

Yes, and these rooms are built for it. The tub platform and columns come out, a freestanding tub and a curbless shower share one glass line, and the whole wet area gets a full waterproofing system with a linear drain. The window stays, reframed inside the wet room with proper flashing. We draw the layout on the walkthrough and price it fixed.

If drains, supply lines, or circuits move, yes, through the City of Bee Cave. Replacing fixtures in place usually does not. We prepare the drawings and meet every inspector. If your address is in unincorporated Travis County or the extraterritorial jurisdiction rather than the city, we confirm the right process before we file.

Sometimes it can be honed and resealed, and we will tell you if that is the right call. In most 2000s baths the etching around the tub and toilet is too deep, and the stone is dated anyway. Removal is slow on a slab and is priced into the fixed estimate. Lighter natural stone or large-format porcelain goes back with a drawn layout.

A full primary bath runs 4 to 6 weeks, with large Bee Cave wet rooms at the longer end because of the tile scope. Hall baths finish in 3 to 4. Glass is measured after tile and adds about two weeks. Payment is staged against completed work, and the final payment comes after your walkthrough.

07Free Estimate

Planning a bathroom project in Bee Cave?

Tell us about the house and we will call within one business day. Or call the owner directly: (630) 827-2735

Free, no obligation. We reply within one business day.

Call or TextFree Estimate