Bathroom Remodeling in Lakeway, TX
The 1980s and 90s Lakeway primary bath was built to impress a buyer in 1988. A tiled garden tub on a platform with two steps up, under a window with a view of the trees. A mirrored wall. Brass fixtures, a bidet, a shower with a glass block wall. The tub has not been filled since the kids were small. We take that platform out and build the shower the room always wanted, usually with the window kept and the view framed. Bathroom remodeling in Lakeway, owner-led and priced fixed before demo.
Free written estimates in Lakeway. Call or text the owner: (630) 827-2735
01Lakeway
The bathrooms Lakeway was built with
The 1970s Lakeway houses have small baths with cast iron tubs, tile set in mortar, and galvanized or copper supply at the end of its life. The 1980s and 90s customs went large: a platform tub taking a quarter of the room, a separate water closet, cultured marble or tile counters with brass strip lights, and a shower that is wide but has a curb, a seat, and a liner-based pan that is now thirty years old. Exhaust fans are often undersized or vent into the attic.
Because these houses step down a slope, many primary baths sit at the lower level with the plumbing running through fill or a short crawl. That changes how we relocate a drain, and we check it before promising a layout. Rough Hollow and the 2010s neighborhoods have big primaries with a drop-in tub, a curbed shower with a pre-formed pan, and thin builder tile. Their plumbing is new and their panels have room.

02Lakeway
What we usually build in Lakeway
The platform comes out and the shower moves into its footprint under the window, often as a wet room with the shower and a freestanding tub behind one run of glass. The window is reframed with proper flashing and glazed for privacy where the lot needs it. Floors get a full waterproofing system and a linear drain, curbless where the slab or framing allows. Heated floors and a steam unit go in more often here than in the city, because these are houses people plan to stay in.
The mirrored wall goes, and lighting gets rebuilt around sconces and overhead light you can see by. The water closet stays but gets a real door. In the 1970s houses we replace the old supply lines while the walls are open, and we tell you so in the estimate. In Rough Hollow the drop-in tub becomes a larger shower or a freestanding tub, tile runs to the ceiling, and the vanity gets drawers. Every bath gets the same tile discipline.
03Lakeway
Permits, HOAs, and logistics in Lakeway
Bathroom remodels that move plumbing or add circuits are permitted through the City of Lakeway, which runs its own building department. We file and meet every inspector. Some Lakeway addresses are in The Hills or unincorporated Travis County, and we confirm which before filing. A new or enlarged window over the shower is an exterior change, which both the city and most HOAs here want to see first.
Lakeway is a longer drive from the Austin tile and glass vendors, and the roads up the canyons are not kind to a slab of stone, so we stage deliveries and measure glass the day tile is finished. A primary bath runs 4 to 6 weeks, a hall bath 3 to 4, and glass adds about two weeks at the end. Scope and price are fixed in writing before demo, and the owner is on site.
04Timeline
A full primary bath remodel typically runs 4 to 6 weeks. Hall baths often finish in 3 to 4. Glass enclosures are measured after tile and add about two weeks at the end, which we build into the schedule from day one.
05Typical Investment
Tile scope, fixtures, and plumbing changes set a bathroom budget. The price is fixed in writing before demo, and we will tell you plainly which upgrades show and which just cost.
06Questions
Bathrooms in Lakeway, answered.
Yes. The platform comes out, the shower takes that footprint under the window, and we build it with a full waterproofing system and a linear drain, curbless when the floor allows. If you want a tub too, a freestanding one often fits behind the same run of glass as a wet room. We draw it on the walkthrough and price it fixed.
If drains, supply lines, or circuits move, yes, through the City of Lakeway. Cosmetic replacement in place usually does not. We prepare the drawings and meet the inspectors. If your address is in The Hills or unincorporated Travis County rather than the city, the authority differs, and we confirm it before anything is filed.
Usually. The window gets reframed inside the shower with proper flashing and sill slope, and we glaze it with privacy glass where the lot needs it. Enlarging or moving the window is an exterior change that the City of Lakeway and most local HOAs want to review first, so we build that step into the schedule.
A full primary bath runs 4 to 6 weeks. A hall bath runs 3 to 4. Glass is measured after tile and adds about two weeks at the end. Replacing old supply lines in a 1970s house can add a few days and is in the estimate. You never pay ahead of the work, and the final payment comes after your walkthrough.