
Bathroom Remodeling in Cedar Park, TX
The Cedar Park primary bath of the 1990s and 2000s is a specific room. A tiled garden tub deck under a window with a plant shelf over it. A 36-inch shower with a fixed seat and a framed door. A cultured marble double vanity with a strip of Hollywood bulbs above the mirror. Hall baths got a fiberglass tub surround and a single sink. Twenty-five years on, the tub holds towels and the shower holds one person badly. We rebuild these rooms around the shower, and bathroom remodeling in Cedar Park is most of what we do up 183.
Free written estimates in Cedar Park. Call or text the owner: (630) 827-2735
01Cedar Park
The bathrooms Cedar Park was built with
Buttercup Creek and the other 1990s neighborhoods were plumbed with copper or early PEX supply and PVC drains, which is good news. The problems are above the slab. Tile tub decks were set on green board with no membrane, so the corner where the deck meets the wall has usually been leaking into the framing for years. Shower pans from that era are mud-set over a vinyl liner that is near the end of its life. The fan is often undersized and vents into the attic.
The 2000s Ranch at Brushy Creek plans have more square footage and the same tub-in-the-corner layout, often with a drop-in oval tub instead of a tiled deck. Vanities got taller but kept doors instead of drawers. Because Cedar Park slabs sit on limestone, the floors are flat and uncracked, which makes a curbless shower easy to recess. Moving a drain, though, means cutting into rock, so we design around the existing drain whenever the plan allows.

02Cedar Park
What we usually build in Cedar Park
The standard move is to take out the garden tub and the shower both and build one large walk-in shower across the whole wet wall. We frame it curbless where the slab depth allows, install a full waterproofing system rather than a liner, and tile with the layout drawn before the first cut. A freestanding tub goes in only when the room has the width for it. The window over the old tub stays, reframed to sit inside the shower with proper flashing.
Hall baths in the 1990s houses get the fiberglass surround cut out and a tiled tub or shower set on real waterproofing. The single vanity is replaced with one that has drawers, and the fan gets ducted to the outside. In the 2000s plans we often convert a rarely used hall tub into a shower for an older parent or a teenager, which is a quicker project than a primary. Both get the same tile standard.
03Cedar Park
Permits, HOAs, and logistics in Cedar Park
Bathroom remodels that relocate plumbing or add electrical are permitted through the City of Cedar Park, and we pull them, including the circuit for heated floors. If your address sits in the unincorporated Williamson County portion of the Ranch at Brushy Creek, there is no city permit for interior work, but state law still requires licensed plumbers and electricians, and that is who we use. Cedar Park HOAs rarely review a bath remodel. We still respect their work-hour and dumpster rules.
Tile showrooms and glass shops along 183 are close, so templating and glass measurement happen on schedule. A full primary bath remodel in Cedar Park runs 4 to 6 weeks, a hall bath 3 to 4, and the glass enclosure adds about two weeks after tile is done. Scope and price are fixed in writing before demo. The owner is on your site.
04Timeline
A full primary bath remodel typically runs 4 to 6 weeks. Hall baths often finish in 3 to 4. Glass enclosures are measured after tile and add about two weeks at the end, which we build into the schedule from day one.
05Typical Investment
Tile scope, fixtures, and plumbing changes set a bathroom budget. The price is fixed in writing before demo, and we will tell you plainly which upgrades show and which just cost.
06Questions
Bathrooms in Cedar Park, answered.
Yes. That is the most common bathroom remodel we build in Cedar Park. Both come out, the wet wall becomes one walk-in shower, and the window over the old tub is reframed to live inside it with proper flashing. Curbless is usually possible on these slabs. We draw the layout on the walkthrough so you can see how much shower you are getting.
If plumbing moves or new circuits go in, yes, through the City of Cedar Park. Retiling in place or swapping a vanity usually does not. We file and meet the inspectors. Some Ranch at Brushy Creek addresses are in unincorporated Williamson County rather than the city, and the process differs there. We check your address before filing anything.
Usually a remodel of the shower. Those pans were mud-set over a vinyl liner, and once the liner fails water sits in the mud bed and the framing. Regrouting does not fix that. We open it, photograph what we find, and rebuild the pan with a modern waterproofing system. If the rest of the bath is fine, we can scope just the shower.
A primary bath takes 4 to 6 weeks of construction. A hall bath takes 3 to 4. Glass goes in about two weeks after tile, and the shower is usable with a temporary curtain before that if you need it. We contain dust, protect your floors, and clean up daily so the rest of the house stays livable.
07Free Estimate
Planning a bathroom project in Cedar Park?
Tell us about the house and we will call within one business day. Or call the owner directly: (630) 827-2735
More in Cedar Park
Bathroom Remodeling Nearby
Other Areas We Serve

