Kitchen Remodeling in Bee Cave, TX
Bee Cave's kitchens were mostly built between the late 1990s and the 2010s, and the 2000s left a mark. Knotty alder cabinets, brown granite, travertine floors, arched niches, heavy corbels under the island, oil-rubbed bronze on everything. Spanish Oaks, Falconhead, and Lake Pointe all have them. The houses are large and well built. The kitchens are stuck in one year. We remodel them into rooms that match the land they sit on, and kitchen remodeling in Bee Cave is finish work at a high level, priced fixed and run by the owner.
Free written estimates in Bee Cave. Call or text the owner: (630) 827-2735
01Bee Cave
The houses Bee Cave was built with
Spanish Oaks and the larger Falconhead homes are 2000s and 2010s customs and semi-customs, often over 4,000 square feet, with kitchens that already have a big island, a hood, a walk-in pantry, and a butler's pantry to the dining room. The plan is fine. The palette is the problem: dark alder, speckled granite, tumbled travertine, and a backsplash with a mural over the range. Plumbing is PEX or copper, panels are 200 amps or more, and the systems are sound.
Lake Pointe goes back to the 1990s with production-plus plans: an arched opening to the family room, a raised bar, a corner pantry, and oak or maple that has darkened. Bee Cave sits on limestone, so slabs are stable and a drain relocation means cutting rock. Many of these kitchens open to a covered patio that never got the outdoor kitchen the lot deserved.

02Bee Cave
What we usually build in Bee Cave
In Spanish Oaks and Falconhead the work is a full finish rebuild inside a plan we mostly keep. Alder comes out or gets replaced with painted or white oak cabinetry to the ceiling. Travertine floors come up, which is slow work on a slab, and wide-plank wood or a lighter stone goes down. The arched niches get squared or closed. The island gets rebuilt without corbels, often longer, with the sink kept where the drain is. A plaster or metal hood replaces the carved one.
A second project we build here is the working pantry: the walk-in or butler's pantry becomes a scullery with a second sink, a second dishwasher, and counter space, so the main kitchen stays clean when the house is full. In Lake Pointe the moves are structural first: arch squared or beam set, bar cut off the island, pantry squared. Outdoor kitchens on the existing covered patio round out a lot of Bee Cave kitchen remodels.
03Bee Cave
Permits, HOAs, and logistics in Bee Cave
Kitchen remodels that move plumbing, gas, structure, or circuits are permitted through the City of Bee Cave, and we handle drawings, filing, and inspections. Some addresses with a Bee Cave mailing address are in unincorporated Travis County or the city's extraterritorial jurisdiction, so we confirm which before filing. Spanish Oaks has an architectural control committee and gate procedures for contractors, Falconhead and Lake Pointe have HOAs with work-hour rules, and an outdoor kitchen or new hood vent on the exterior usually needs their review.
Bee Cave is out Highway 71 from the Austin stone yards and cabinet shops, and most of these neighborhoods are gated, so we register crews, schedule deliveries for the morning, and stage stone so nothing waits at a gate. Custom cabinetry carries 8 to 12 weeks of lead time. Construction runs 6 to 10 weeks, and travertine removal is accounted for in the schedule. Price is fixed in writing before demo.
04Timeline
Most full kitchen remodels run 6 to 10 weeks of construction. Custom cabinetry adds 8 to 12 weeks of lead time before demo, so we order early and start tearing out only when your materials are staged and confirmed.
05Typical Investment
Cabinetry, stone, and structural changes drive a kitchen budget more than anything else. Before you commit to a dollar, you get a fixed written price and a line-item look at where the money goes.
06Questions
Kitchens in Bee Cave, answered.
If plumbing, gas, structure, or new circuits are involved, yes, through the City of Bee Cave. Replacing cabinets and counters in place usually does not. We handle the filing and inspections. If your address is in the extraterritorial jurisdiction or unincorporated Travis County rather than the city, the process differs, and we confirm that before anything is filed.
Yes, and that is most of what we do in Bee Cave. Alder, brown granite, travertine, corbels, and arched niches come out. Painted or white oak cabinetry to the ceiling, lighter stone, a plaster hood, and a flat-front island go in. The plan, the plumbing, and the island location usually stay, which keeps the project in the finish-work range.
It is slow and loud, and it is the part of the schedule people underestimate. Travertine set in thinset on a slab comes up in pieces, and the slab needs grinding before a new floor goes down. We account for it in the schedule and the fixed price, contain the dust, and keep the rest of the house livable while it happens.
Construction runs 6 to 10 weeks for a full kitchen, with floor removal pushing larger Bee Cave kitchens toward the long end. Custom cabinetry adds 8 to 12 weeks of lead time before demo. You get a written schedule, staged payments tied to completed work, and the owner on site in person every day.
07Free Estimate
Planning a kitchen project in Bee Cave?
Tell us about the house and we will call within one business day. Or call the owner directly: (630) 827-2735